As approved by University Council. Updated September 2009
A. Essential
|
|
|
Project |
Description |
|
1 |
Southend – refurbishment of former URC |
Subject to planning 1272 m2 for
E15 satisfies the School’s planned commitments, but will not be
available in time for September 2008.
Complete. |
|
2 |
Southend – Complete fit-out of Gateway
Building |
Completion of floors 5 and 2. Floor 5
critical for 2008/09. Complete. |
|
3 |
Colchester – Lakeside Theatre new entrance |
Scheme will satisfy a legal requirement
and provide a recognised entrance to the Theatre. This could be
subsumed into project B9. |
|
4 |
Loughton – replace 8 no. temporary
buildings |
Eight buildings/spaces require permanent replacement. Currently this amounts to 464 m2
but some reduction by rationalisation may be possible. |
B. High Priority
|
|
|
Project |
Description |
|
1 |
Colchester – re-sign the campus externally |
Remove existing, replace with new, similar
design. Totem sign in each square. |
|
2 |
Colchester – re-sign the campus
internally. |
Overhaul all internal signage and complete to new house style. |
|
3 |
Colchester – clean and enhance existing
buildings |
A second clean of the original academic
concrete buildings, re-covering the under window panels. |
|
4 |
Colchester – replace temporary buildings |
Portacabins (354 m2) and Social
Studies Link Building (322 m2) replaced by 837 m2. |
|
5 |
Colchester – refurbish Square 2 |
|
|
6 |
Colchester – refurbish Square 5 |
Assumes non structural central feature. |
|
7 |
Colchester – improvements to Squares 1, 3
and 4 |
Repair and enhance the original
refurbishment of these spaces. |
|
8 |
Colchester – Student Centre |
Landmark building – student focussed to
resolve a number of problem areas in a way that creates community
ownership of the space – Library, Accommodation Office,
Reception/Helpdesk, Teaching, Integrated Learning, Academic spaces,
Catering, Council Room, Lakeside Piazza for example. 8934 m2 total
adjoining existing Library Building. |
|
9 |
Colchester – redevelop Sports Pavilion |
Demolish existing and replace with two
storey (1210 m2). |
|
10 |
Colchester – 25 m Swimming Pool |
Option 2 of SMC Charter Architects
Development Plan for the Sports Centre. Standalone building with
changing, learner pool and w.c.’s. |
|
11 |
Colchester – Sports Hall |
New 4 court Sports Hall |
|
12 |
Southend – Additional facilities |
Elmer Square development |
|
13 |
Colchester – Research Facilities |
Utilise HEFCE allocation for research
within capital allocation (schemes to be determined). (RCIF) |
| 14 |
All campuses – interactive remote teaching
facilities |
Integrate communication media between
campuses in line with ISS Strategy. |
|
15 |
All campuses – Networking |
Re-engineering and refresh |
|
16 |
Colchester – Telephone System |
Replace PABX |
|
17 |
All campuses – Management Information |
IHR project |
|
18 |
All campuses – IT infrastructure |
Re-engineering and refresh |
|
19 |
All campuses |
Academic equipment – research, teaching
and general
– £300k per annum |
C. Self Financing
|
|
|
Project |
Description |
|
1 |
Colchester – extended fitness suite to
Sports Centre |
Existing facility increased by 450 m2. |
|
2 |
Colchester – Knowledge Gateway |
Develop total site infrastructure,
Research Park Phase 1 and office village |
|
3 |
Student Residences – Southend |
London Road (Hollybrook) site |
|
4 |
Student Residences – Colchester |
Meadows site – Phase 1 350 units |
|
5 |
Student Residences – Colchester |
Meadows site – Phase 2 500 units |
|
6 |
Student Residences – Colchester |
Meadows site – Phase 3 350 units |
|
7 |
Wivenhoe House Hotel |
Refurbishment – as part of Hotel School project. |
D. New projects - September 2008
|
|
|
Project |
Description |
|
1. |
Colchester – Temporary teaching space |
8 no. seminar rooms to accommodate over
recruitment of students for 2008/09. Complete. |
|
2. |
Colchester – Refurbishment of the Blues
Café |
Update worn-out facility following
customer survey. Complete. |
|
3. |
Southend – Mezzanine to SU facility |
Phase 2 following popularity of Phase 1
project. Complete. |
|
4. |
Colchester – Conversion of Hex to UECLAA
gallery |
Progression totally dependent on external
funding. |
E. New approved projects - September 2009
|
|
|
Project |
Description |
|
1. |
Colchester – Networked Media Lab |
RCIF |
|
2. |
Colchester – Miscellaneous Infrastructure |
Upgrade Utilities Supplies |
|
3. |
Colchester – Bio Science Research Lab |
RCIF |
|
4. |
Colchester – Learning Centre |
Conversion of CBH for Teaching Space |
|
5. |
Colchester – Temporary Teaching Space 2009 |
|
|
6. |
Colchester – Upgrade Teaching Rooms (2009) |
|
|
7. |
Colchester – Knowledge Gateway
Infrastructure |
|
|
8. |
Colchester – Print Centre Collator |
|